so it turns out that ryan isn’t great at documenting a van build… since i was working full time (and overtime) while we were stationed in portland for the past two months, i could not help get footage of the amazing process ryan underwent to produce our new home.
since my last blog post, we have completed the van!!!
it took about 4-5 weeks of full time work, and i am still totaling the expenses, but probably around $8,000 for everything including the vehicle. more details on expense breakdown to come soon.
in the final weeks of the van build, a lot of things came together…
ryan framed the kitchen and modified a piece of bamboo donated by my boss for the counter top and pull out table/desk.
he built out the cupboards and drawers. complete with soft close hinges! and then, he gave them all a couple coats of oil to protect the wood and make the grain pop. our van is majorly cedar, including these beautiful cupboards.
as everything came together, some of the last details were finished up. we added a vent fan over the bed to draw air from the front windows throwout the van, and ryan finished up all the electrical.
the sink was custom made from a bowl to minimize depth and allow space for our pull out table/desk.
and then there was the one thing that i contributed to the van… the curtains. i will admit that i cannot even take full credit for them since a friend of mine did assist with the sewing. thanks elana!
and then, we unpacked our storage unit into the van and moved in…
now, to hit the road…